嘉兴统计年鉴 2017,栏目:七 农业>>7-31 市区农村水利基本情况(2003-2016),共1页
CAJ格式文件下载
PDF格式文件下载
Excel格式文件下载
7-31市区农村水利基本情况
(2003-2016) |
Basic
Conditions of Water Conservancy of Urban District
(2003-2016) |
| 指 标 |
单位 |
Item |
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
2016 |
| 一、有效灌溉面积 |
千公顷 |
Effective Irrigated Area (1 000 hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
| 占耕地面积比重 |
*** |
Percentage to Cultivated Area (%) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
| 二、机电排灌面积 |
千公顷 |
Mechanical and Electrical
Irrigated Area (1 000
hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
| 三、排灌机械装机容量 |
千瓦 |
Power of Irrigation and Drainage Machinery (kw) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| 四、旱涝保收面积 |
千公顷 |
Area of Stable Yield Despite
Drought or Excessive
Rain (1 000 hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| 五、易涝耕地面积 |
千公顷 |
Area Liable to Flooding Water
Logging (1 000
hectares) |
*** |
*** |
*** |
*** |
*** |
|
*** |
*** |
|
| #除涝面积 |
千公顷 |
Flooded or Water Logged Area
under Control (1
000 hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| 六、堤防总长度 |
公里 |
Total Length of Dikes (km) |
*** |
*** |
|
*** |
*** |
*** |
*** |
| 七、保护耕地 |
千公顷 |
Cultivated Area Protected (1 000 hectares) |
|
| 八、水利工程年供水量 |
万立方米 |
Annually Water Supply of Water
Conservancy (10
000 cu. m) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| #农业供水 |
万立方米 |
Water Supply for Agriculture (10 000 cu. m) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| 工业供水 |
万立方米 |
Water Supply for Industry (10 000 cu. m) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| 九、农田基建完成土石方 |
万立方米 |
Cubic Metre of Earth and Stone
Completed
Through Farmland Basic Construction (10 000
cu. m) |
|
*** |
|
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
| #水利建设 |
万立方米 |
Water Conservancy Construction (10 000 cu. m) |
|
*** |
|
| 十、实用人工 |
万工日 |
Real Labor (10 000 man - days) |
|
*** |
|
| 十一、投入资金 |
万元 |
Devoted Capital (10 000 yuan) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
|
| 注:本表数据均来自市水利局,由于方法制度改变,排灌机械装机容量等指标取消。 |
|
| Note:
The data comes from Jiaxing water department ; Because of the method system
reform, some indexes are canceled. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|