嘉兴统计年鉴 2016,栏目:七 农业>>7-31 市区农村水利基本情况(2002-2015),共1页
CAJ格式文件下载
PDF格式文件下载
Excel格式文件下载
7-31市区农村水利基本情况(2002-2015) |
Basic
Conditions of Water Conservancy of Urban District |
(2002-2015) |
指标 |
单位 |
Item |
2002 |
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
一、有效灌溉面积 |
千公顷 |
Effective Irrigated Area (1 000 hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
占耕地面积比重 |
*** |
Percentage to Cultivated Area (%) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
二、机电排灌面积 |
千公顷 |
Mechanical and Electrical
Irrigated Area (1000
hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
三、排灌机械装机容量 |
千瓦 |
Power of Irrigation and Drainage Machinery ( kw) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
四、旱涝保收面积 |
千公顷 |
Area of Stable Yield Despite
Drought or Excessive
Rain (1 000 hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
五、易涝耕地面积 |
千公顷 |
Area Liable to Flooding Water
Logging (1 000
hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
|
*** |
*** |
|
#除涝面积 |
千公顷 |
Flooded or Water Logged Area
under Control (
000 hectares) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
六、堤防总长度 |
公里 |
Total Length of Dikes (km) |
*** |
*** |
*** |
|
*** |
*** |
*** |
七、保护耕地 |
千公顷 |
Cultivated Area Protected (1 000 hectares) |
|
八、水利工程年供水量 |
万立方米 |
Annually Water Supply of Water
Conservancy (10
000 cu. m) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
#农业供水 |
万立方米 |
Water Supply for Agriculture (10 000 cu. m) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
工业供水 |
万立方米 |
Water Supply for Industry (10 000 cu. m) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
九、农田基建完成土石方 |
万立方米 |
Cubic Metre of Earth and Stone
Completed
Through Farmland Basic Construction ( 10 000
cu. m) |
*** |
|
*** |
|
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
#水利建设 |
万立方米 |
Water Conservancy Construction (10 000 cu. m) |
*** |
|
*** |
|
十、实用人工 |
万工日 |
Real Labor (10 000 man - days) |
*** |
|
*** |
|
十一、投入资金 |
万元 |
Devoted Capital (10 000 yuan) |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
*** |
|
注:本表数据均来自市水利局,由于方法制度改变,排灌机械装机容量等指标取消。 |
|
Note:
The data comes from Jiaxing water department;Because of the method system
reform,some indexes are canceled. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|