中国经济社会发展统计数据库

中国海洋统计年鉴 2009,栏目:4 主要海洋产业生产能力>>4-7 主要潮汐电站分布情况(2008年),共1页

           CAJ格式文件下载   PDF格式文件下载   Excel格式文件下载

  4-7主要潮汐电站分布情况(2008年) 
Distribution of Major Tidal Power Stations,2008 
 
    电站名称     运行情况 装机容量
    Nane     Status of operation Capacity
江厦潮汐试验电站 *** ***
  It began construction in 1970,was put into use in  
Jiangxia Experimental Tidal Power Station 1 980,and has been in operation so far.  
海山潮汐电站 *** ***
Haishan Tidal Power Station It began construction in 1 972.was put into use in  
  1 975,and has been in operation so far.  
岳浦潮汐电站 ***  
  It began construction in 1970,stopped power  
Yuepu Tidal Power Station  generation in 1 978.  
白沙口潮汐电站 *** ***
  It began construction in 1 970,was put into use in  
Baishakou Tidal Power Station 1 978,and has been in operation so far.  
果子山潮汐电站 已经投入前期筹备工作阶段,未确定开工时间。  
  It has been put into the first stage ofpreparation,and  
Guozishan Tidal Power Station the openning date has not been fixed.