常州统计年鉴 2008,栏目:,共1页
CAJ格式文件下载
PDF格式文件下载
Excel格式文件下载
| 20-10
CONSTRUCTION OF ORGANIC TOWN BY REGION(2007) |
| |
| |
|
|
|
|
|
| Item |
Whole
Municipality |
Wujin
District |
Xinbei
District |
Liyang
City |
Jintan
City |
| Population,Area and Planning of Organic
Towns |
|
|
|
| Number of Organic Towns(unit) |
|
*** |
*** |
*** |
*** |
*** |
| Organic Town With
Overall Planning |
|
*** |
*** |
*** |
*** |
*** |
| Built-up Area of The Town(sq.km) |
|
*** |
*** |
*** |
*** |
*** |
| Registered Population In
Built-up Area of The Town(10000 persons) |
|
*** |
*** |
*** |
*** |
*** |
| Temporary Population In Built-up
Area of The Town(10000 persons) |
|
*** |
*** |
*** |
*** |
*** |
| Residential Housing of
Organic Towns |
|
|
|
| Total Floor Space of Buildings of This
Year(10000 sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Above mixed structure |
|
*** |
*** |
*** |
*** |
*** |
| Floor Space of Buildings Completed of
This Year(10000 sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Composite Structure |
|
*** |
*** |
*** |
*** |
*** |
| Per Capita Living Space of Residential
Buildings(sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Public
Buildings&Productive Buildings of Organic Towns |
|
|
|
| Floor Space of Public Buildings at
Year-end(sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Above mixed structure |
|
*** |
*** |
*** |
*** |
*** |
| Floor Space of Public Buildings
Completed of This Year(sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Above mixed structure |
|
*** |
*** |
*** |
*** |
*** |
| Floor Space of Productive Buildings of
This Year(sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Above mixed structure |
|
*** |
*** |
*** |
*** |
*** |
| Floor Space of Productive Buildings
Completed of This Year(sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Above mixed structure |
|
*** |
*** |
*** |
*** |
*** |
| Tap Water Supply of Organic
Town |
|
|
|
| Number of Public Tap Water Supply
Facilities(unit) |
|
*** |
*** |
|
*** |
*** |
| Daily Capacity of Public Tap Water
Supply(10000 m³) |
|
*** |
*** |
|
*** |
*** |
| Number of Self-made Tap Water Supply
Facilites(unit) |
|
*** |
*** |
*** |
*** |
|
| Daily Capacity of Self-made Tap Water
Supply(10000 m³) |
|
*** |
*** |
*** |
*** |
|
| Total Annual Volume of Water
Supply(10000 tons) |
|
*** |
*** |
*** |
*** |
*** |
| Consumption Volume for
Livelihood |
|
*** |
*** |
*** |
*** |
*** |
| Consumption Volume for
Production |
|
*** |
*** |
*** |
*** |
*** |
| Length of Water Supply Pipelines(km) |
|
*** |
*** |
*** |
*** |
*** |
| Population with Access to Tap
Water(10000 persons) |
|
*** |
*** |
*** |
*** |
*** |
| Per Capita Daily Consumption of Tap
Water for Residential Use(liter) |
|
*** |
*** |
*** |
*** |
*** |
| Percentage of Population with Access
to Tap Water(%) |
|
*** |
*** |
*** |
*** |
*** |
| Public Utilities of Organic
Towns |
|
|
|
| Fuel Gas Subscribers(10000
persons) |
|
*** |
*** |
*** |
*** |
*** |
| Length of Roads(km) |
|
*** |
*** |
*** |
*** |
*** |
| Area of Roads(10000 sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Street Lamps(unit) |
|
*** |
*** |
*** |
*** |
*** |
| Bridges(uint) |
|
*** |
*** |
*** |
*** |
*** |
| Length of Flood Control Dikes(km) |
|
*** |
*** |
*** |
*** |
*** |
| Length of Drainage Piplelines(km) |
|
*** |
*** |
*** |
*** |
*** |
| Length of Discharge Culverts(km) |
|
*** |
*** |
*** |
*** |
*** |
| Parks,Gardens
and Green Areas and Environment Sanitation of Organic Towns |
|
|
|
| Coverage Space of Green Areas(hectare) |
|
*** |
*** |
*** |
*** |
*** |
| Green Areas(hectare) |
|
*** |
*** |
*** |
*** |
*** |
| Total Area of Public Green
Areas(hectare) |
|
*** |
*** |
*** |
*** |
*** |
| Per Capita Public Green Area(sq.m) |
|
*** |
*** |
*** |
*** |
*** |
| Percentage of Greenery
Coverage(%) |
|
*** |
*** |
*** |
*** |
*** |
| Ratio of Green Space(%) |
|
*** |
*** |
*** |
*** |
*** |
| Annual Volumn of Work of Domestic
Garbage Disposal(10000 tons) |
|
*** |
*** |
*** |
*** |
*** |
| Number of Mechinery of Environmental
Sanitation(unit) |
|
*** |
*** |
*** |
*** |
*** |
| Public Lavatories(unit) |
|
*** |
*** |
*** |
*** |
*** |
| Construction Investment in
Organic Towns |
|
|
|
| Investment Completed(10000 yuan) |
|
*** |
*** |
*** |
*** |
*** |
| Residential Housing |
|
*** |
*** |
*** |
*** |
*** |
| Public Buildings |
|
*** |
*** |
*** |
*** |
*** |
| Productive Buildings |
|
*** |
*** |
*** |
*** |
*** |
| Public Utilities |
|
*** |
*** |
*** |
*** |
*** |
| Tap Water
Supply |
|
*** |
*** |
*** |
*** |
*** |
| Roads and
Bridges |
|
*** |
*** |
*** |
*** |
*** |
| Drainage |
|
*** |
*** |
*** |
*** |
*** |
|
Garden&Forestry |
|
*** |
*** |
*** |
*** |
*** |
| Environmental
Sanitation |
|
*** |
*** |
*** |
*** |
*** |
| Fiscal Revenue used for
Construction of Public Utilities(10000 Yuan) |
|
*** |
*** |
|
*** |
*** |
| Fiscal
Revenue at Town |
|
*** |
*** |
|
*** |
*** |
| Note:The statistic data of organic towns exclude four towns,such
as Hutang,Niutang,Jincheng and Licheng.The ststistic range shall be built-up
area. |
|
|
|
|
|
|
|
|