山西统计年鉴 2000,栏目:10 交通运输邮电通讯业>>10-13 铁路运输主要技术经济指标,共1页
CAJ格式文件下载
PDF格式文件下载
Excel格式文件下载
|
| 10-13铁路运输主要技术经济指标MAJOR
ECONOMIC AND TECHNICAL INDICATORS OF RAILWAY TRANSPORT |
| 指标 |
Items |
太原铁路局Taiyuan
Railway Bureau |
大同铁路局Datong
Railway Bureau |
临汾铁路局Linfen
Railway Bureau |
| 客运机车日车公里(公里) |
Daily Distance per
Freight Locomotive (km) |
*** |
*** |
*** |
| 货运机车日车公里(公里) |
Daily Distance per Passenger
Locomotive (km) |
*** |
*** |
*** |
| 货运机车平均牵引总重量(吨) |
Average Total Tonnage of Freight |
*** |
*** |
*** |
| |
locomotives (ton) |
|
| 蒸汽机车(吨) |
Steam Locomotives Diesel Locomotives
Electric Locomotives |
*** |
|
*** |
| 内燃机车(吨) |
Average Daily Ton-kilometers of |
*** |
*** |
*** |
| 电力机车(吨) |
Locomotives (10 000 ton-km) |
*** |
*** |
*** |
| 货运机车日产量(万吨公里) |
Average Daily Ton-kilometers of |
*** |
*** |
*** |
| |
Locomotives (10 000 ton-km) |
|
| 蒸汽机车(万吨公里) |
Steam Locomotives (10 000 ton-km) |
*** |
|
*** |
| 内燃机车(万吨公里) |
Diesel Locomotives (10 000 ton-km) |
*** |
*** |
*** |
| 电力机车(万吨公里) |
Electric Locomotives (10 000 ton-km) |
*** |
*** |
*** |
| 蒸汽机车万吨公里耗煤(公斤) |
Coal Consumption of Steam Locomotive
(kg) |
*** |
|
*** |
| 内燃机车万吨公里耗油(公斤) |
Oil Consumption of Diesel Locomotive
(kg) |
*** |
*** |
*** |
| 电力机车万吨公里耗电(千瓦小时) |
Electricity Consumption of Electric |
*** |
*** |
*** |
| |
Locomotive (10 000 kwh) |
|
| 旅客列车技术速度(公里/小时) |
Technical Speed of Passenger |
*** |
*** |
*** |
| |
Trains km/hr) |
|
| 旅客列车旅行速度(公里/小时) |
Traveling Speed of Passenger |
*** |
*** |
*** |
| |
Trains (km/hr) |
|
| 货物列车技术速度(公里/小时) |
Technical Speed of-Freight |
*** |
*** |
*** |
| |
Traias (Whr) |
|
| 货物列车旅行速度(公里/小时) |
Running Speed of Freight |
*** |
*** |
*** |
| |
Trains (km/hr) |
|
| 货物列车运行正点率(%) |
Punctuality Rate of Freight Trains in |
*** |
*** |
*** |
| |
Running (%) |
|
| 货物列车出发正点率(%) |
Punctuality Rate of Freight Trains at |
*** |
*** |
*** |
| |
Departure (%) |
|
| 旅客列车运行正点率(%) |
Punctuality Rate of Passenger Trains
in |
*** |
*** |
*** |
| |
Running (%) |
|
| 旅客列车出发正点率(%) |
Punctuality Rate of Passenger Trains
in |
*** |
*** |
*** |
| |
Departure (%) |
|
| 货车周转时间(天) |
Trunning Around Time of Freight Cars
(day) |
*** |
*** |
*** |
| 货车一次作业停留时间(小时) |
Handling Time of Freight Cars (hour) |
*** |
*** |
*** |
| 货车中转停留时间(小时) |
Transfer Waiting Time per Car (hour) |
*** |
*** |
*** |
|
|
|
|
|